Port Control
General Enquiries
Live Webcam
White logo with abstract shapes above the words Montrose PORT AUTHORITY on a light grey background.
  • Port Info
    • About Us
    • Our Team
    • The Board
    • Careers
    • Annual Reviews
    • Live Webcam
    • Marine / Port Control
    • General Enquiries
  • Marine
    • Marine Info
    • Quayside Services
    • Codes & Certifications
    • Montrose Harbour Revision Order
  • Services
    • Oil & Gas
    • Renewables
    • Decommissioning
    • General Cargo
    • Cruise
    • Property Leasing
    • Shore Power
    • Customs House
    • Montrose Port Industrial Park
  • Environment, Health & Safety
    • Health & Safety
    • Environmental & Sustainability
    • Net Zero
    • Shore Power
    • Health, Safety & Environmental Policy
    • Our Policies
  • Community
    • Our Community
  • News & Updates
    • MPA News
    • Notice to Mariners
    • Seagreen
    • Inch Cape
    • Customs House
    • Montrose Port Industrial Park
    • Montrose Port History
    • Draft Masterplan
Featured image for “New Berth Opens at Montrose Port Authority”
November 29, 2019

New Berth Opens at Montrose Port Authority

Significant progress within Montrose Port Authority’s infrastructure redevelopment masterplan was celebrated on Wednesday 27 November, as Phase Two of an extensive quayside refurbishment was officially opened.

Around 120 invited guests attended the ribbon cutting ceremony on the North Quay, which was carried out by Mrs Helen Carmichael, wife of MPA Chairman, John Carmichael, with pupils from nearby Lathallan School Pipe Band performing as part of the celebrations.

Forming part of the 20-year masterplan, the increased capacity, depth alongside and associated utilities work, has increased the maximum potential size of berthing vessels from 12,000 to 18,000 gross tonnage. In addition, these developments will also deliver significant environmental benefits, removing an estimated 1.26m tonnes of freight from roads and 86,000 HGV lorry journeys.

Construction of the new common user berth was carried out by civil engineering contractor, Farrans and includes a large lay down area and an additional heavy lift pad. Carrying out the reconstruction in two phases (the first being completed in March this year), allowed the North Quay to remain operational throughout the 13-month project.

Montrose Port CEO Tom Hutchison said: “These continue to be exciting times for Montrose Port; the completion of this latest redevelopment phase simply builds upon our reputation as a key hub for both the offshore energy and general cargo market.

“The additional berth capacity enables us to strengthen and enhance our existing capabilities and further expand the size and type of vessel we can welcome to the Port, which is particularly pertinent as we continue to attract a diverse range of clients.”

Browse News Categories

  • News
  • Notice to Mariners
  • SSE Renewables
  • Appointments to the Board
  • Community
  • Job Vacancies
  • Kids Activity Pack
  • Memberships
  • Montrose Port History
  • Montrose Port Staff
  • Vessels
Image
About Us
  • About Us
  • Our Team
  • The Board
Our Services
  • Oil & Gas
  • Renewables
  • Decommissioning
  • General Cargo
  • Cruise
  • Property Leasing
  • Quayside Services
T&Cs
  • Our Terms & Conditions
  • Our Policies
  • Marine Safety Plan (2024–2027)
  • Certification of Port Marine Safety Code
  • Pilotage Directions
  • Pilot Exemption Certificate Procedure
© Montrose Port Authority
Website by Due North Creatives
Main menu
  • Port Info
    • ← Back
    • About Us
    • Our Team
    • The Board
    • Careers
    • Annual Reviews
    • Live Webcam
    • Marine / Port Control
    • General Enquiries
  • Marine
    • ← Back
    • Marine Info
    • Quayside Services
    • Codes & Certifications
    • Montrose Harbour Revision Order
  • Services
    • ← Back
    • Oil & Gas
    • Renewables
    • Decommissioning
    • General Cargo
    • Cruise
    • Property Leasing
    • Shore Power
    • Customs House
    • Montrose Port Industrial Park
  • Environment, Health & Safety
    • ← Back
    • Health & Safety
    • Environmental & Sustainability
    • Net Zero
    • Shore Power
    • Health, Safety & Environmental Policy
    • Our Policies
  • Community
    • ← Back
    • Our Community
  • News & Updates
    • ← Back
    • MPA News
    • Notice to Mariners
    • Seagreen
    • Inch Cape
    • Customs House
    • Montrose Port Industrial Park
    • Montrose Port History
    • Draft Masterplan
CONTACT US
Port Control
General Enquiries
Live Webcam
Downloads
View Port Tariff
Tide Timetable 2026
Download Port Map